LOCAL PLAN: FEEDBACK FORM |
Wirral is required by law to produce a Local Plan. To meet Government targets, Wirral must make enough land available to allow for 12,000 new homes to be built over the next 15 years.
To achieve this, we are required to conduct a full review of Green Belt land in the borough.
Formal consultation – including detailed maps and technical information on each site – starts on 3 September 2018. Before that date, Wirral residents are being asked to provide general views and opinions on housing in the borough.
To achieve this, we are required to conduct a full review of Green Belt land in the borough.
Formal consultation – including detailed maps and technical information on each site – starts on 3 September 2018. Before that date, Wirral residents are being asked to provide general views and opinions on housing in the borough.